Apartment Plumbing and Pipe Replacement in Tbilisi: Works and Price

Proremonti lays new plumbing and replaces old pipes as part of a Tbilisi flat renovation.

A complete plumbing point costs 80-110 GEL per point for labour. It covers running the cold water, hot water and sewer pipes to the fixture and connecting it.

All water, sewer and heating pipes go in before the floor screed is poured. Before the screed covers them, they are photographed with dates.

What does plumbing and pipe replacement in a flat cost?

Plumbing and pipe replacement in a flat costs 80-110 GEL per point for labour when the whole job is done.

Pipe and fitting materials are priced separately and go into the overall estimate.

WorkPrice
Complete plumbing point (running pipes and connecting the fixture) 80 to 110 GEL per 1 point
One stage only (running pipes or fitting the fixture) about 50 GEL per 1 point
Heating pipe point 50 to 80 GEL per 1 point
Radiator installation about 100 GEL per 1 radiator
Bathroom sanitary set (material) about 1,500 to 4,000 GEL

What does one plumbing point include?

A plumbing point covers running the pipes to a set spot and then fully connecting the fixture there.

When the work is split in two, one stage alone costs about 50 GEL per point. That is the case when a tradesperson only runs the pipes, or only fits a fixture to pipes already in place.

Why does an old flat need new pipes?

An old flat needs new pipes because, over time, the metal water pipes and the cast-iron sewer pipes wear out.

Old water pipes are galvanised steel coated with scale inside, and in old houses the pipes are often rusted. Cast-iron sewer risers are often in poor shape too, which smells, stains and rust show.

A full renovation replaces both systems with modern pipes, so the new finishes stay protected. More on old buildings is on old apartment renovation.

How are heating pipes and radiators laid?

Heating pipes run from the heat source to each radiator before the floor screed is poured.

Laying a heating pipe point costs 50-80 GEL per point for labour. On average, a flat needs about 1 point for every 10 m².

Fitting each radiator costs about 100 GEL per radiator. A small flat needs a heating unit with a boiler, manifold and cabinet just as a large one does, so the system is chosen at the start.

At which renovation stage are plumbing and pipes done?

All plumbing and heating pipes in a flat go in before the floor screed is poured.

Where pipes sit in the sequence varies: some crews run them with the wiring before plastering, others right after plastering. Plastering always comes before the screed, because plaster that falls on the floor damages the screed.

After the screed, bathroom waterproofing goes on in the wet areas and the tiles are laid. The toilet, sink and bathroom mixers are fitted at the very end, as set out on renovation stages.

Does replacing plumbing pipes need a permit?

Replacing and repairing plumbing pipes inside your flat is ordinary repair and needs no official permit.

Replacing a flat’s internal utilities needs no approved project. Moving the building’s shared riser, though, is network reconstruction, and the procedure depends on the building class.

If moving the plumbing also means removing partitions or cutting new openings, see the rules on wall removal permit.

How are plumbing and heating pipes checked before they are covered?

Plumbing and heating pipes are pressure-checked for leaks before the screed is poured, and are photographed in full with dates.

Wiring and pipes are the hidden part of a flat, and changing them after finishing is hard. To accept the work properly, use our stage acceptance checklist.

What does our 2-year warranty cover on plumbing?

Our 2-year warranty fully covers the pipes we laid, if they fail because of how we did the work.

If you bought a finish material yourself, we still take responsibility for fitting it reliably.

The warranty does not cover damage from water coming from neighbours or from the building’s shared risers. It also does not cover a factory fault in a material you bought, misuse, or work someone else repaired.

How do you get a free preliminary estimate for your flat?

You get a free preliminary written estimate by sending your floor area, building type, the number of wet areas and plumbing points, and photos.

Managing from abroad? Write in English for a free written preliminary estimate in 2 working days by email, WhatsApp, or Viber. How we run a job for owners abroad is on renovation for owners abroad.

Request an estimate

Based on your floor area, building type, and photos, you get a free reply by email, WhatsApp, or Viber within 2 working days, with no obligation. Before the contract we see the flat, in person or on a video call, and fix the price.

Our schedule is booked until January 2027, so new renovations start from January. You still get your estimate now, and we agree the date to see the flat now.