Warranty and Payment Terms

Our work carries a 2-year warranty from the day you accept the whole job. You pay 20% when you sign the contract, then each stage after you have checked it, and the last payment after the defects on the handover list are fixed.

The same terms are written into every contract we sign. This page explains them in plain words.

What Does the Warranty Cover?

The warranty covers anything we built or installed that fails because of how we did it. That includes tiles, screed, plaster, paint, the pipes and wiring we laid, and the doors and fittings we fitted.

If you bought a material yourself, we still answer for how we fitted it.

What Is Not Covered?

  • Appliances and products These carry the manufacturer’s warranty. We hand you their papers at handover.
  • Materials you supplied A fault in the material itself is a matter for the seller, not for our warranty.
  • Misuse and wear Damage from misuse, from rooms left without ventilation, and normal wear.
  • Water from outside the flat Leaks from neighbours or from the building’s risers.
  • Work by others Anything changed or repaired by someone else after handover.

How Do You Make a Warranty Claim?

  1. Write to us Send a short description and a few photos to info@proremonti.ge or to the messenger you use with us.
  2. We answer within 5 working days You get our reply and, for a covered fault, the day we come to repair it.
  3. We repair it at our cost Work, materials and transport for a covered fault are ours to pay.

The Free Check at Month 12

Twelve months after handover we come back for a free check. New walls and floors settle in the first year, so we look at hairline cracks, sealant gaps and door adjustment, and fix what our warranty covers.

What Does the Law Add?

Under the Civil Code of Georgia, defect claims can be made within one year of accepting the work, and claims about the building itself within five years (Article 655). Our 2-year warranty is longer than that one year, and your rights under the law stay in place.

How Do Payments Work?

  1. 20% at signing You pay 20% of the contract price when you sign. It lets us buy the first materials and book the crew for your start date.
  2. Each stage after you check it The contract lists the stages and the amount for each. You pay for a stage once you have checked it, in person or on a video walk-through.
  3. The last payment after handover We fix every defect on the handover list first. Then you make the last payment.

Every payment is made by bank transfer against our invoice, including international transfers if you live abroad. We show you the receipt for every material we buy for you.

What If We Finish Late?

The start date and the deadline are written into the contract. If we finish late, we pay you 0.1% of the price of the work for each day of delay, up to 5% of it.

Can the Price Change During the Work?

Only with your written agreement. If you ask for extra work, or something hidden turns up when walls are opened, we price it and agree it with you before we start it.

Frequently Asked Questions

When does the warranty start?

On the day you accept the whole job and sign the handover report. Accepting single stages does not start it early.

Who buys the materials?

We buy the rough materials and show you every receipt. You choose the finishes, and you can buy materials yourself from our list.

What language is the contract in?

The contract is in Georgian, with an English or Russian copy for you. If the versions differ, the Georgian text applies.

Request an estimate

Send the area, the job and a few photos. Your estimate arrives in 2 working days, and these terms come with every contract.

Our schedule is booked until January 2027, so new renovations start from January. You still get your estimate now, and we agree the date to see the flat now.