Renovated living room in a Tbilisi apartment

Apartment renovation in Tbilisi

We renovate apartments from black frame to keys. Send the area, the job and a few photos. Your preliminary written estimate arrives in 2 working days. We are booked until January 2027, but your estimate and visit date come now.

150 to 2000+GEL / m²
Labour and materials, cosmetic to premium full renovation. Tbilisi, 2026.

The price, the start date and the deadline are written into the contract, and our work carries a 2-year warranty. We work in Georgian, English and Russian. The contract is in Georgian with an English or Russian copy, and the Georgian text prevails.

How remote renovation works

Our prices

Our price per square metre, labour and materials together, runs from about 150 GEL for a cosmetic refresh to 2000+ GEL for a premium renovation. Enter your flat below to see its range.

From white frame

300 to 1000+ GEL / m²
DemolitionMinimal
Walls and floorAlready level

Full, from black frame

300 to 1500+ GEL / m²
Economy300 to 600
Mid-range400 to 900
Premium700 to 1500+

Cosmetic

150 to 450+ GEL / m²
WallsStripped back
WorkPainting and floors

Calculate your price

Scope
Area
Moving a wet point+80-110 ₾ per point
0
Wall demolition+10-35 ₾ per m² of wall
0m²

How we work

  1. Free estimateSend the area, the job and photos; a preliminary written estimate arrives in 2 working days. We are booked until January 2027, but your estimate and visit date come now.
  2. We see the flatIn person, or on a video call if you are abroad, and we fix the price.
  3. ContractThe price, the start date and the deadline are written in it.
  4. Work in stagesYou check each stage before you pay for it.
  5. HandoverWe fix every defect on the handover list before the last payment.
  6. Warranty2 years on our work, and we come back for a free check at month 12.
Demolition and partitions

Old coverings, tiles and unwanted partitions come out; rubble is carried away.

For a flat of about 60 m², a full renovation takes about 2-3 months from black frame and 1-2 months from white frame.

Stages · Plastering · Floor screed · Tiling · Laminate

What to decide before each stage starts: Renovation planning.

20% at signing, the rest after you check

You pay 20% when you sign the contract. After that, each stage is paid once you have checked it, in person or on a video walk-through. The last payment comes after the defects on the handover list are fixed.

If we finish late, we pay 0.1% of the price of the work for each day, up to 5%.

2-year warranty on our work

The 2-year warranty runs from the day you accept the whole job. If something we built or installed fails because of our work, write to us and we answer within 5 working days. At month 12 we come for a free check.

What the warranty covers

Renovating while you are abroad

You do not need to fly in. Proremonti is an apartment renovation company in Tbilisi where one contact person speaks English, Russian or Georgian, and every decision is confirmed in writing.

  • A photo and video report every week
  • Each stage accepted on a video call before you pay
  • Dated photos of pipes, wiring and waterproofing before they are covered
  • Keys held by the site lead and returned at handover
How remote renovation works

New-build flats

Developers hand over flats in black, white or green frame. We start from the state you receive and finish the flat to live in or to rent out.

  • Interior partitionsDepends on developer
  • Wall plasteringNo
  • Floor screedNo
  • Electrical wiring inside the apartmentNo (to the door)
  • Water and sewage pipes to wet pointsNo
  • Bathroom (floor screed, utilities)No
Black frame
  • Interior partitionsYes
  • Wall plasteringYes
  • Floor screedDepends on developer
  • Electrical wiring inside the apartmentDepends on developer
  • Water and sewage pipes to wet pointsDepends on developer
  • Bathroom (floor screed, utilities)Usually no
White frame
  • Interior partitionsYes
  • Wall plasteringYes
  • Floor screedYes
  • Electrical wiring inside the apartmentYes
  • Water and sewage pipes to wet pointsYes
  • Bathroom (floor screed, utilities)Depends on developer
Green frame
Black, white and green frame explained

Request a free estimate

Tell us the address, the area, the building type and what you want done. Photos help. Your preliminary written estimate arrives in 2 working days. The estimate is free, with no obligation. We are booked until January 2027, but your estimate and visit date come now.

How much work is it?
How big is it, and when does it start?
When it starts
How can we reach you?

Room photos or a floor plan help, but are optional. Send them by email, or on WhatsApp or Viber once we write to your number.

Your email is ready

Your email is prepared, not sent yet. It reaches us only after you send it in your mail app. If your mail app did not open, copy the text below and send it to info@proremonti.ge.

Open the email again
Question 1 of 3