Wall Plastering: Price per 1 m², Cement, Giper, and Gaji

Leveling walls with a straightedge

Hand plastering labour costs 15-25 GEL per 1 m² of wall, while machine plastering with materials costs about 30 GEL per 1 m² of wall.

Wall plastering levels rough surfaces with a thick coat before a skim coat or wall tiles.

Wall plastering is a key step in the renovation stages.

Your price varies by material (sand-cement, gypsum, or gaji), coat thickness, and whether materials are included in the rate.

Plastering method
15-25GEL per m²
30GEL per m²
Wall area (m²)
Your estimate2,250 to 3,750 ₾

For 150 m², this costs about 2,250-3,750 GEL.

Request our estimate

How much does wall plastering cost per 1 m²?

Wall plastering by hand with any binder costs 15-25 GEL per 1 m² of wall for labour only. Machine plastering costs about 30 GEL per 1 m² of wall for works and materials together.

The price per 1 m² depends on what is included in the quote.

What the price includes Price, GEL per 1 m² of wall
Gypsum material for hand plastering, per 1 cm of layer thickness 6.5 to 8.5
By hand (sand-cement, gypsum, or gaji), labour only 15 to 25
By machine, works and materials together About 30

How much does plastering cost with materials?

Plastering with materials costs about 30 GEL per 1 m² of wall when applied by machine.

Material cost is added to labour when plastering by hand with gypsum.

A hand-applied gypsum plaster like Rotband uses about 8.5 kg per 1 m² for each 1 cm of thickness.

Material cost is about 6.5-8.5 GEL per 1 m² for every 1 cm of thickness. A 2 cm coat needs twice as much material.

Why do tradespeople quote different plastering prices?

Plastering quotes vary by whether materials are included, binder type, coat thickness, wall condition, and total area. Machine work is also priced differently from hand work.

Always ask the crew to state clearly in the quote whether the price per 1 m² includes materials and what thickness it covers.

How much does it cost to plaster the walls of a 60 m² apartment?

The wall area to plaster in a 60 m² apartment is about 150-180 m².

Wall area is roughly 2.5-3 times the floor area. Both the perimeter walls and both sides of interior partitions need plastering.

  • Labour only is about 2,000-4,500 GEL (15-25 GEL per 1 m² of wall, for 150-180 m² of wall). At the National Bank of Georgia rate of 2.5973 GEL per US dollar (3 November 2026), that is about $800 to $1,700.

How do cement, gypsum, and gaji plaster compare?

Cement, gypsum, and gaji plaster all level your walls.

Cement, gypsum, and gaji differ in where they are used, drying time, and price.

MaterialWhere it is usedIn the bathroom
Sand-cement Interior and exterior work, damp areas Yes, a water-resistant choice for kitchens and bathrooms
Gypsum (Rotband, Giper) Interior walls and ceilings; applied from a few millimetres to several centimetres thick Normal-humidity rooms, including bathrooms if protected from wetting.
Gaji For plastering and masonry mortars; starts setting in a few minutes For damp areas, sand-cement is chosen instead

Where water hits the wall directly, apply waterproofing before wall tiles.

Which plaster is best for a bathroom?

Choose sand-cement plaster for a shower zone or damp bathroom, or use gypsum plaster with waterproofing under the wall tiles.

Gypsum plaster made for normal-humidity rooms can also be used in a bathroom if protected from getting wet.

Apply waterproofing over the primed surface wherever water hits directly, before laying wall tiles.

The mix instructions state the minimum plaster thickness required under wall tiles (for Rotband, it is 10 mm).

What is gaji and how much does gaji plastering cost?

Gaji is an air-hardening binder made by firing natural clay-gypsum rock at 150-250 degrees.

Gaji starts setting in 3-5 minutes and finishes in 30-40 minutes.

Crews use gaji for plastering and masonry mortars and keep it sealed to protect it from moisture.

Gaji plastering labour costs about 25 GEL per 1 m² of wall.

A 40 kg bag of gaji is about 5 GEL.

A 25 kg bag of gaji or ready plaster mix costs about 7-9 GEL.

For more details on the condition of old walls, see Old Tbilisi apartment renovation.

What is machine plastering?

Machine plastering uses a plastering machine that mixes and sprays the plaster onto the wall before the surface is ruled flat.

Machine plastering is usually done with a machine-grade gypsum mix.

Machine plastering works and materials together cost about 30 GEL per 1 m² of wall.

Machine plastering cuts working time.

Plastering a standard 50-150 m² apartment takes about 5-15 days.

What is Giper plastering?

Giper is a gypsum and perlite plaster mix sold in 30 kg bags.

Giper plasters interior brick, concrete, and block walls by machine or by hand.

Giper has become popular in Georgia in recent years mainly because crews can apply it with a machine.

What is plastering with beacons (guide rails)?

Plastering with beacons uses metal profiles fixed to the wall beforehand. Each beacon acts as a guide rail to give a single flat plane and even plaster thickness.

Small dabs of plaster are placed vertically every 30 cm along the wall.

The metal beacons are pressed into the dabs and levelled into one plane.

A 3-metre metal beacon costs 1.5-2.5 GEL. Straight walls are essential for fitting wall tiles, kitchen cabinets, and wardrobes without gaps.

Which comes first, wall plastering or floor screed?

Walls are plastered first and the floor screed is laid only afterwards. Falling plaster during wall work damages a finished screed.

Wall plastering and floor screed follow this work order:

  1. Electrical wiring
  2. Wall plastering
  3. Floor screed
  4. Skim coat (filler)

Some crews install water and heating pipes along with electrical wiring before plastering, while others fit them after plastering. Either way, the pipes are in place before pouring the floor screed.

Plastering and floor screed together take about 2-4 weeks, including drying time. In a white frame flat (a developer shell with basic rough finishes), the walls are already plastered and the floor screed is already laid.

The floor is next once the walls are finished. floor screed is the stage right after plastering.

How long does plaster take to dry?

Plaster drying time depends directly on the material used and the room conditions.

A 1 cm coat of gypsum dries in about 7 days at 20 degrees Celsius and 60% air humidity.

Check the mix instructions for exact times.

The finishes below go on only after the plaster is completely dry:

  • Primer
  • Skim coat
  • Waterproofing
  • Wall tiles
  • Paint
  • Wallpaper

Gaji sets in 30-40 minutes, but setting does not mean it has dried.

High winter humidity slows drying for both plaster and floor screed.

Thick coats and cold, damp weather also slow the process.

The wall must be completely dry before applying a skim coat.

How to check plastering quality

You can check plastering quality on site with a few practical checks.

Print this stage's sheet from our stage acceptance checklist.

What is the difference between plastering and a skim coat (putty)?

Plastering and a skim coat (filler or putty) differ in layer thickness and purpose.

Plastering levels the wall with a thick layer (gypsum plaster such as Rotband is applied 7-50 mm thick).

A skim coat is a thin finishing layer applied at the next stage over the dried wall before painting.

Skim coat labour costs 5-30 GEL per 1 m². Decorative plaster (Espanka, Venetian, or Munich plaster) is a completely separate finishing job.

How do you check a plastering crew and quote before agreeing?

A comparable plastering quote is a written itemised list where every line item states its unit of measurement.

To get a preliminary written estimate, send:

  • the wall area or room dimensions
  • photos of each wall
  • the building type

Include the current wall condition: bare block or brick walls, or old plaster.

Include your preferred mix if you have chosen one.

We prepare the estimate for free, with no obligation.

We send a reply within 2 working days by email, or by WhatsApp or Viber to your number.

Managing from abroad? Write in English for a free written preliminary estimate in 2 working days by email, WhatsApp, or Viber. How we run a job for owners abroad is on renovation for owners abroad.

Request an estimate

Based on your floor area, building type, and photos, you get a free reply by email, WhatsApp, or Viber within 2 working days, with no obligation. Before the contract we see the flat, in person or on a video call, and fix the price.