Apartment Renovation Planning: Checklist and Common Mistakes
Planning an apartment renovation means deciding before day one what work you need, in what order, on what budget, and by whom. You also check upfront if any work requires a permit.
Skipping this stage causes the costliest mistakes: starting without a written estimate, keeping no contingency reserve, or changing plans mid-job.
The checklist below follows the exact order you need to make decisions. Separate guides cover quiet hours, permits, your works contract, and choosing a crew.
Where Do You Start Planning an Apartment Renovation?
Planning an apartment renovation starts with defining the type of renovation you need. Follow the steps below in order, as each decision depends on the one before it.
Common Renovation Mistakes and How to Avoid Them
Common renovation mistakes are almost always planning mistakes. They are cheap to prevent before work starts, but expensive to fix later.
| Mistake | What It Causes | How to Avoid It |
|---|---|---|
| Starting without a written estimate | Without pricing materials, labour, and extra jobs upfront, you cannot control your budget | Demand an itemised written estimate before work begins |
| Having no contingency reserve | Once old surfaces are stripped, hidden jobs (levelling walls, extra sockets, replacing pipes, floor repairs) quickly exhaust your budget | Keep 10-15% of your budget in reserve |
| Choosing a crew by lowest price alone | Fixing poor workmanship often costs far more than paying a skilled tradesperson from the start | Compare quotes on the exact same list of works and speak with past clients |
| Not planning sockets and lighting upfront | Adding sockets, light fixtures, or internet points after the renovation is expensive | Mark the exact spot for every appliance and light before wiring begins |
| Moving pipes after finishes are laid | Moving pipes usually means ripping out wall tiles and redoing the work from scratch | Fix the exact location of every wet point before laying pipes |
| Changing the design mid-renovation | Increases both material and labour costs | Choose all finishing materials before work starts |
| Starting finishes before electrical wiring | One stage ruins the work of another | Replace electrical wiring and pipes before any finishing work |
| Miscalculating material quantities | Extra delivery trips, lost time, and a higher budget | Calculate materials from the estimate, and buy 5-15% extra for wall tiles and laminate |
| Leaving the whole process to the crew | Defects only show up at the end of the renovation | Inspect each stage of work before you pay for it |
| Installing appliances before work finishes | Appliances get damaged or covered in building dust | Plan appliance spots upfront, but install them only after the renovation is complete |
For the full step-by-step order of work, see the Renovation Stages guide.
How Do You Plan a Renovation Budget?
Your renovation budget covers three parts: works, materials, and a contingency reserve, which as a rule is 10-15% of the budget.
That reserve pays for hidden jobs that only appear once work starts, such as levelling walls, adding electrical points, or replacing plumbing.
Apartment renovation prices per m² usually exclude furniture and appliances, so budget for those as a separate item.
Also factor in the removal of construction waste, about 150-300 GEL per trip, and delivery of materials to site. To get an initial figure for your floor area, use the Renovation Calculator.
Before You Sign: What Must You Have in Writing?
Before you sign anything, require a written itemised estimate showing the volume and price of every job. See what this document must include, with a sample, on the Renovation Estimate page.
What to include in your contract is covered on the Renovation Works Contract page.
Planning from abroad? Write in English for a free written preliminary estimate within 2 working days by email, WhatsApp, or Viber. There is no obligation.
Who Should You Hire for Your Renovation?
You can hire a renovation company, a crew, or individual tradespeople for your renovation. How they differ and what to check before hiring is covered in How to Choose a Renovation Company.
When Do You Need to Check for a Permit?
You must check permit rules whenever you knock down or move a wall, change the layout, or join a balcony to a room. See which jobs need a permit and which do not on the Renovation Permits page.
Neighbours: When Is Noisy Renovation Work Allowed?
Noisy work like demolition and drilling hits your neighbours hardest, so warn them of your planned days in advance.
The exact hours when renovation noise is allowed are listed on the Renovation Work Hours page.