Stage Acceptance Checklist

We hand over each stage of your renovation against this checklist, and you pay for a stage after you check it. Print the sheet for the stage in front of you, tick each line, and write down anything that is not right.

How Do You Use This Checklist?

  1. Check the stage Walk through it in person, or with us on a video call if you are abroad.
  2. Tick the hidden work Before pipes, wiring and waterproofing are covered, we send you dated photos of each one. Tick each photo off on the sheet.
  3. Note each defect Write the room, what is wrong and the date, add a photo, and send it to us in writing by messenger or email.
  4. Pay for the stage You pay for a stage after you have checked it. Defects found at handover go on the handover list, and we fix them before the last payment.

Sheet 1: Demolition, Wiring and Pipes

Photographed before it is covered

RoomWhat is wrongPhoto sent onFixed on
    
    
    

Checked by / Date

Sheet 2: Plaster and Floor Screed

Plaster

Floor screed

RoomWhat is wrongPhoto sent onFixed on
    
    
    

Checked by / Date

Sheet 3: Waterproofing and Tiling

Before the tiles

Photographed before it is covered

Finished tiling

RoomWhat is wrongPhoto sent onFixed on
    
    
    

Checked by / Date

Sheet 4: Painting, Laminate and Ceilings

Painted walls

Before the laminate

Laid laminate

Ceilings

RoomWhat is wrongPhoto sent onFixed on
    
    
    

Checked by / Date

Sheet 5: Cleaning and Handover

RoomWhat is wrongPhoto sent onFixed on
    
    
    

Checked by / Date

What Goes on the Defect Lines?

RoomWhat is wrongPhoto sent onFixed on

Each defect you send us in writing stays on record with its date, so nothing depends on a phone call. If a fault in our work turns up after handover, our warranty covers it, and we answer a claim within 5 working days.