Stage Acceptance Checklist
We hand over each stage of your renovation against this checklist, and you pay for a stage after you check it. Print the sheet for the stage in front of you, tick each line, and write down anything that is not right.
How Do You Use This Checklist?
- Check the stage Walk through it in person, or with us on a video call if you are abroad.
- Tick the hidden work Before pipes, wiring and waterproofing are covered, we send you dated photos of each one. Tick each photo off on the sheet.
- Note each defect Write the room, what is wrong and the date, add a photo, and send it to us in writing by messenger or email.
- Pay for the stage You pay for a stage after you have checked it. Defects found at handover go on the handover list, and we fix them before the last payment.
Sheet 1: Demolition, Wiring and Pipes
Photographed before it is covered
| Room | What is wrong | Photo sent on | Fixed on |
|---|---|---|---|
Checked by / Date
Sheet 2: Plaster and Floor Screed
Plaster
Floor screed
| Room | What is wrong | Photo sent on | Fixed on |
|---|---|---|---|
Checked by / Date
Sheet 3: Waterproofing and Tiling
Before the tiles
Photographed before it is covered
Finished tiling
| Room | What is wrong | Photo sent on | Fixed on |
|---|---|---|---|
Checked by / Date
Sheet 4: Painting, Laminate and Ceilings
Painted walls
Before the laminate
Laid laminate
Ceilings
| Room | What is wrong | Photo sent on | Fixed on |
|---|---|---|---|
Checked by / Date
Sheet 5: Cleaning and Handover
| Room | What is wrong | Photo sent on | Fixed on |
|---|---|---|---|
Checked by / Date
What Goes on the Defect Lines?
| Room | What is wrong | Photo sent on | Fixed on |
|---|---|---|---|
Each defect you send us in writing stays on record with its date, so nothing depends on a phone call. If a fault in our work turns up after handover, our warranty covers it, and we answer a claim within 5 working days.