Bathroom Waterproofing in Tbilisi: Price and How It Is Done
Bathroom waterproofing with sealing tape costs about 15-45 GEL per 1 m² for labour in Tbilisi. The waterproofing material is paid separately.
We apply waterproofing in the bathroom and at every other wet point (plumbing point), under the tiles. Before the tiles cover it, we send you dated photos of it.
What does bathroom waterproofing cost?
Bathroom waterproofing labour costs about 15-45 GEL per 1 m², with the material priced separately.
Materials are not included in these prices. A typical liquid coating uses about 1.1-1.4 kg per 1 m² for two coats.
A whole 4 m² bathroom renovation, with labour, tiles and sanitary ware, costs about 3,000-12,000 GEL. At the National Bank of Georgia rate of 2.5973 GEL per US dollar (3 November 2026), that is about $1,200 to $4,600.
| Work | Price |
|---|---|
| Waterproofing with sealing tape, labour | about 15 to 45 GEL per 1 m² |
| Example: 4 m² bathroom floor | about 60 to 180 GEL labour |
| Bathroom tiling, labour | about 100 GEL per 1 m², waterproofing, tiles and adhesive extra |
Why does a bathroom need waterproofing?
Bathroom waterproofing protects the flat downstairs from water leaking through your floor.
It sits under the tiles. If it leaks later, fixing it means taking the tiles back up, so it pays to do it right the first time.
Where does waterproofing go in a bathroom?
Waterproofing goes across the whole bathroom floor, the shower zone, the corners and around every pipe.
In the shower zone, the walls are covered up to the height where water hits them directly. Inner corners, movement joints and pipe outlets get special care, with elastic sealing tape set between the two coats.
The same applies to every other wet point (plumbing point) in the flat. A waterproofing layer can also go under underfloor heating.
How is liquid waterproofing applied?
Liquid waterproofing is an elastic coating brushed or rolled on in two coats, with sealing tape set between them.
- The base is made flat, solid, clean and dry: moisture up to about 4% on a cement base and 0.5% on a gypsum base. Concrete must be over 3 months old, cement screed and plaster over 28 days.
- Spots with mould or fungus get an antifungal primer.
- The whole surface is primed, about 4 hours before the coating.
- The first coat goes on in one direction.
- Sealing tape goes into the inner corners, joints and around pipe passages.
- The second coat goes on crosswise, about 90 minutes later for a typical product, covering the tape.
- Tiles go on only once the coating has dried, which is about 4 hours after the second coat for a typical product.
Drying times differ by product, so the product’s instruction governs. The work needs about +5 to +25 °C and air humidity up to 80%.
The coating is never the finish layer. Tiles, screed or plaster must always cover it.
When does waterproofing happen in a renovation?
Waterproofing comes after the pipes, plastering and floor screed, and right before wall and floor tiling.
Floor screed usually needs at least 25-30 days before tiles go on. The tile adhesive’s instruction gives the exact minimum age and moisture of the screed. See the full order on the stages list.
Which plaster goes under tiles in a shower zone?
In a shower zone or a damp bathroom, choose sand-cement plaster, or gypsum plaster with waterproofing under the wall tiles.
Gypsum plaster made for rooms with normal humidity can still be used in a bathroom, as long as it is protected from getting wet. Wherever water hits the wall directly, waterproofing goes over the primed plaster before the wall tiles.
The mix’s instruction gives the minimum plaster thickness under tiles (10 mm for Rotband). Waterproofing can also go on plasterboard.
How do you check waterproofing before tiling?
You check waterproofing before any tile covers it, because afterwards nobody can see it.
Print this stage's sheet from our stage acceptance checklist.
Does your warranty cover waterproofing?
Our 2-year workmanship warranty covers what we built or installed that fails because of how it was done.
If you bought a finish material yourself, we still take responsibility for fitting it. The warranty does not cover damage from water coming from neighbours or from the building’s shared risers.
It also does not cover a factory fault in a material you bought, misuse, normal wear, or work someone else changed or repaired after handover. The full terms are on our warranty page.
How do you get a free preliminary written estimate for waterproofing?
You get a free preliminary written estimate by sending your bathroom size and photos.
Send the bathroom floor area, photos of the floor, walls and shower zone, and the wet points you have. You get the estimate by email, WhatsApp or Viber.
Managing from abroad? Write in English for a free written preliminary estimate in 2 working days by email, WhatsApp, or Viber. How we run a job for owners abroad is on renovation for owners abroad.
Other stages and prices
Request an estimate
Based on your floor area, building type, and photos, you get a free reply by email, WhatsApp, or Viber within 2 working days, with no obligation. Before the contract we see the flat, in person or on a video call, and fix the price.
Our schedule is booked until January 2027, so new renovations start from January. You still get your estimate now, and we agree the date to see the flat now.