Kitchen Renovation: Cost and Order of Work
We renovate kitchens in Tbilisi: our building labour (work only, no materials) for a 7 m² kitchen is about 1,300-4,100 GEL. At the National Bank of Georgia rate of 2.5973 GEL per US dollar (3 November 2026), labour is about $500 to $1,600.
The labour total covers the core building jobs:
- Strip-out of old wall tiles
- New electrical and plumbing points (wet points)
- Wall plastering
- Skim coat (putty) and painting and decorating on walls and ceiling
- Laying backsplash wall tiles and floor tiles
- Rubbish removal
Kitchen cabinets (furniture), worktops, appliances and building materials are not included in this price. They are a separate budget.
For prices across other rooms and trades, see the list of renovation works.

How much does a kitchen renovation cost?
Kitchen renovation costs in Tbilisi are calculated by unit of building work. Building labour comes to about 1,300-4,100 GEL for a 7 m² kitchen.
- An electrical point costs 15-40 GEL.
- A plumbing wet point costs 80-110 GEL.
- Laying wall or floor tiles costs 20-80 GEL per 1 m².
- Hand plastering walls is 15-25 GEL per 1 m² of wall.
The table below shows labour rates only. For whole-apartment rates, see the full labour price table.
What does a 7 m² kitchen renovation cost?
Labour to renovate a 7 m² kitchen costs about 1,300 to 4,100 GEL.
The 7 m² kitchen estimate is based on an existing 2.5 × 2.8 m room with a 2.7 m ceiling height. The room has one window and one door.
Surface work covers:
- Stripping old floor and backsplash tiles (9 m²)
- Hand plastering walls (25 m²)
- Skim coat and painting on 23 m² of walls and 7 m² of ceiling
- Tiling a 2 m² backsplash and 7 m² floor
The estimate also includes 2 plumbing wet points (sink and dishwasher) and 1 load of rubbish removal.
The 10 electrical points cover:
- Hob, oven and extractor hood
- Dishwasher and fridge
- 3 sockets above the worktop, ceiling light and switch
| Work | Price |
|---|---|
| Strip-out of old tiles with rubbish removal | 5 to 25 GEL per 1 m² |
| Electrical point, wiring and socket or switch | 15 to 40 GEL per 1 point |
| Plumbing wet point, pipe run and fixture connection | 80 to 110 GEL per 1 point |
| Hand wall plastering | 15 to 25 GEL per 1 m² of wall |
| Skim coat (putty) | 5 to 30 GEL per 1 m² |
| Painting | 5 to 25 GEL per 1 m² |
| Laying floor tiles or wall tiles, tiles up to 60 cm | 20 to 80 GEL per 1 m² |
| Laying laminate | 5 to 25 GEL per 1 m² |
| Rubbish removal | about 150 to 300 GEL per 1 load |
| Work | Quantity | Unit price | Total |
|---|---|---|---|
| Strip-out of old tiles | 9 m² | 5-25 GEL per 1 m² | 45-225 GEL |
| Hand wall plastering | 25 m² | 15-25 GEL per 1 m² | 375-625 GEL |
| Wall skim coat (putty) | 23 m² | 5-30 GEL per 1 m² | 115-690 GEL |
| Wall painting | 23 m² | 5-25 GEL per 1 m² | 115-575 GEL |
| Ceiling skim coat and painting | 7 m² | about 15-40 GEL per 1 m² | about 105-280 GEL |
| Backsplash wall tiles | 2 m² | 20-80 GEL per 1 m² | 40-160 GEL |
| Floor tiles | 7 m² | 20-80 GEL per 1 m² | 140-560 GEL |
| Plumbing points (wet points) | 2 points | 80-110 GEL per 1 point | 160-220 GEL |
| Electrical points | 10 points | 15-40 GEL per 1 point | 150-400 GEL |
| Rubbish removal | 1 load | about 150-300 GEL per 1 load | about 150-300 GEL |
| Total labour | about 1,300-4,100 GEL | ||
What is not included in the kitchen labour price?
The 7 m² kitchen labour total covers building work only. The labour price does not include the following costs:
- Kitchen furniture (cabinets) and worktop
- Appliances (hob, oven, extractor hood, dishwasher, fridge)
- Materials, including wall and floor tiles, plaster, skim coat (putty), primer, paint, tile adhesive and grout
- Cable, sockets and switches, pipes, sink and mixer tap, light fittings
- Floor screed or self-levelling layer, if the floor needs it
- Moving a gas pipe or gas hob, and extractor hood ducting
- Wall demolition
As a material, ceramic tiles cost about 25-120 GEL per 1 m². Buy 5-15% extra over the tiled area for cuts and stock.
Keep about 10-15% of your budget in reserve for extra work that appears during the renovation.
How much does the price change by kitchen size?
Kitchen renovation labour ranges from about 1,200-3,500 GEL for 5 m² to about 1,500-4,700 GEL for 9 m². Estimated building labour totals for different kitchen sizes are shown in the table below.
| Kitchen area | Labour |
|---|---|
| 5 m² (2.0 × 2.5 m) | about 1,200-3,500 GEL |
| 7 m² (2.5 × 2.8 m) | about 1,300-4,100 GEL |
| 9 m² (3.0 × 3.0 m) | about 1,500-4,700 GEL |
Each row assumes the same works, with 2 plumbing wet points, 10 electrical points and a 2 m² tiled backsplash.
In a Khrushchyovka (Khrushchev-era block), kitchens are mostly 4.6-7.9 m². In a Czech project flat, kitchens are 7-9 m².
To calculate renovation costs for your whole flat, use the renovation calculator.
In what order is a kitchen renovated?
A kitchen renovation starts with planning and puts hidden wiring and pipes in place before surface finishes. Kitchen cabinets are fitted last.
- Planning. Decide in advance where cabinets, the sink, each appliance and lighting will go. Sockets, switches, water supply and drainage points are placed strictly from this plan.
- Demolition and strip-out. Old cabinets, appliances and surfaces (including old tiles) are stripped out, and building rubbish is removed from the flat.
- Utilities. Water, drainage and electrical lines (plus gas, if you have a gas hob) are installed or replaced before finishing work begins.
- Walls, ceiling and floor. The crew completes wall plastering, lays backsplash wall tiles and floor tiles, and applies skim coat and paint to walls and ceiling.
- Furniture and appliance installation. Kitchen cabinets, worktops and appliances are fitted and connected once all building work is complete.
Take exact measurements of the kitchen before having the cabinets made.
How many electrical and plumbing points does a kitchen need?
Kitchen points are counted by appliance, so fix the spot for every unit before running pipes and cables inside the walls. The 7 m² kitchen example above includes 10 electrical points and 2 plumbing points.
You can count your own needs from this checklist.
If you have many appliances, plan the wiring for the expected load on the circuit.
The sink and dishwasher are the kitchen’s wet points (plumbing points). Labour for each plumbing point costs 80-110 GEL, the same rate as in a bathroom.
For a detailed breakdown of point layout and pricing, see bathroom renovation.
How is the kitchen backsplash (work wall) tiled?
The kitchen backsplash (work wall) is the space between the worktop and upper cabinets. Backsplash tiles are laid like standard wall tiles at 20-80 GEL per 1 m² for labour.
In the 7 m² kitchen example, the backsplash area is 2 m² (about 3 m of worktop length by about 60 cm of tile height). Tiling the backsplash costs 40-160 GEL.
For how tile size affects laying prices and other related details, see laying wall tiles and floor tiles.
What should you know about gas pipes and extractor hoods?
Moving a gas meter or gas riser requires submitting an application to the Tbilisi gas distribution company. The gas distribution company installs, repairs, removes and replaces the gas meter assembly.
The gas distribution company inspects the flat’s internal gas system and disconnects any appliance that does not meet requirements.
Good kitchen ventilation controls cooking smells, moisture and grease. An open-plan kitchen combined with a room needs a properly fitted extractor hood so smells do not spread through the flat.
Frequently Asked Questions
Is kitchen furniture included in the renovation price?
No, kitchen furniture (cabinets) is not included in the renovation price. The 1,300-4,100 GEL figure for a 7 m² kitchen covers building labour only.
Cabinets, worktops, appliances and materials are budgeted separately.
Managing from abroad? Write in English for a free written estimate within 2 working days. How we run a job for owners abroad is on renovation for owners abroad.
Do you need a permit to combine a kitchen and a room?
Combining a kitchen and a room by removing, moving or cutting an opening in an internal partition counts as renovation. Renovation requires neither a building permit nor a building notice.
Internal partition work counts as renovation unless the partition is a fire-rated separating wall.
Removing a load-bearing wall or cutting an opening in one is reconstruction, not renovation.
Related Works and Prices
Request an estimate
Based on your floor area, building type, and photos, you get a free reply by email, WhatsApp, or Viber within 2 working days, with no obligation. Before the contract we see the flat, in person or on a video call, and fix the price.
Our schedule is booked until January 2027, so new renovations start from January. You still get your estimate now, and we agree the date to see the flat now.