Apartment Electrical Wiring in Tbilisi: Price and Full Rewiring
Electrical wiring is one of the first and most important stages of a flat renovation. We do it as part of a full renovation, before the walls are plastered and the floor is screeded. Electrical labour costs 15-40 GEL per point.
What does electrical wiring in a flat cost?
Electrical wiring labour in a Tbilisi flat costs 15-40 GEL per point; labour for a 37 m² flat is about 500-1,500 GEL, and for an 80 m² flat about 1,000-3,500 GEL.
Cable and other materials are priced separately and go into the estimate.
The point price covers running the wiring to the point and fitting the socket or switch. The final cost depends on the flat’s size, the number of rooms and how many appliances you have.
| Work | Price |
|---|---|
| Electrical point (running cable to it, fitting a socket or switch) | 15 to 40 GEL per 1 point |
| Electrical labour for a 37 m² flat (about 1 point per 1 m²) | about 500 to 1,500 GEL |
| Electrical labour for an 80 m² flat | about 1,000 to 3,500 GEL |
What does full rewiring of a flat include?
Full rewiring of a flat includes a new distribution board, new circuit breakers, new copper wiring and fitting every point.
The old wires are taken out of use and replaced with modern copper cable. Each room and each powerful appliance gets insulated wire of the right cross-section.
Fitting covers chasing the walls, laying the cables, setting the mounting boxes and preparing the sockets. When the work is done, the whole network is tested with instruments.
Why does an old flat need new wiring?
An old flat needs new wiring because the old aluminium network has no protective earthing and cannot carry today’s load.
A Soviet flat was designed for a total load of only 3-4 kW. Modern appliances such as a hob, an oven, an air conditioner and a washing machine need 12-15 kW.
When you plan an old apartment renovation, the wiring should be replaced first.
At which renovation stage is the wiring done?
Electrical wiring is done at the start of a renovation, right after demolition and partitions, before the walls are plastered and the floor is screeded.
Wiring and plumbing pipes are the hidden part of a flat, and changing them after finishing is very hard. So the cables must go in before the walls are plastered and the screed is poured.
Plastering comes before the screed, because plaster that falls on the floor damages the screed. In a black frame, the wiring goes in as soon as the partitions are built.
In a white frame, the walls are already plastered, but they still get chased again to bury the wiring. The full order is in our guide to renovation stages.
The right order protects the new finish. The rough systems come first, then plastering, floor screed, putty and painting.
How do you plan sockets before the walls are chased?
To plan sockets well, decide where the bed, TV, desk, kitchen appliances and lights go before the walls are chased.
Starting without a plan often leads to badly placed wiring and extra costs. In new builds, the developer’s points often have to be moved to fit the furniture layout.
Does replacing a flat’s wiring need a permit?
Repairing or replacing the electrical wiring inside your flat needs no official permit or notice.
By law, repairing a flat’s own utility networks is repair and needs no permit. Neither does repairing or renewing the parts of shared systems that serve the flats.
Altering, adding or removing the building’s utility networks is network reconstruction, and its procedure follows the building class. Moving a shared riser falls into this second group and is approved by the Tbilisi City Hall Architecture Service.
If you also plan to remove partitions, see the rules on wall removal permit.
How do you check the wiring before the walls are closed?
Before the walls are closed, the wiring is checked with dated photos and by checking each socket’s position.
Before we cover the wiring in a wall or floor, we send you dated photos of it. That way you know exactly where each line runs. To accept the stage in detail, use our stage acceptance checklist.
How do you get a free preliminary estimate for electrical work?
You get a free preliminary written estimate for electrical work by sending your floor area, building type, number of rooms and photos of the electrical panel.
Managing from abroad? Write in English for a free written preliminary estimate in 2 working days by email, WhatsApp, or Viber. How we run a job for owners abroad is on renovation for owners abroad.
Other stages and prices
Request an estimate
Based on your floor area, building type, and photos, you get a free reply by email, WhatsApp, or Viber within 2 working days, with no obligation. Before the contract we see the flat, in person or on a video call, and fix the price.
Our schedule is booked until January 2027, so new renovations start from January. You still get your estimate now, and we agree the date to see the flat now.