Building Partition Walls in a Flat: Block and Plasterboard, Prices
Partition walls go up at the very start of a flat renovation, before the wiring goes in and the walls are plastered. We build interior walls in partition block or in plasterboard (drywall).
Laying a block partition costs about 25 GEL per m² of partition for labour. With blocks, adhesive and labour together, a block partition costs about 40-45 GEL per m². Carrying the blocks into the flat, with transport and loaders, adds about 400-1,000 GEL per flat.
A one-layer plasterboard (drywall) partition costs about 20-40 GEL per m² for labour. The plasterboard material is priced separately and goes into the estimate.
What does building partitions in a flat cost?
Building partitions in a flat costs about 25 GEL per m² for labour with block, and about 20-40 GEL per m² with plasterboard.
The plasterboard material is priced separately and goes into the estimate.
| Work | Price |
|---|---|
| Laying a block partition, labour | about 25 GEL per 1 m² of partition |
| Block partition with blocks, adhesive and labour | about 40 to 45 GEL per 1 m² of partition |
| Plasterboard (drywall) partition, one layer, labour | about 20 to 40 GEL per 1 m² |
| Carrying blocks into the flat (transport, loaders) | about 400 to 1,000 GEL per flat |
| Removing a non-load-bearing brick or block partition, labour | 10 to 35 GEL per 1 m² of wall |
| Removing a plasterboard partition | about 5 to 10 GEL per 1 m² |
Block or plasterboard: which partition is better?
The choice of partition material depends on the flat and the budget, because block and plasterboard differ in price and in how they go up.
A block partition is built with partition blocks and a special adhesive. Its full price with materials and labour is about 40-45 GEL per m² of partition.
With blocks, you also need to count carrying the material into the flat (transport and loaders). That service adds about 400-1,000 GEL per flat.
A plasterboard (drywall) partition is fitted on a frame. Fitting one layer costs about 20-40 GEL per m² for labour, plus the material.
At which renovation stage are new partitions built?
New partitions in a flat are built first of all, before the wiring, plastering and floor screed start.
Right after the partitions go up comes the electrical wiring, because cables and socket points are fitted before the walls are plastered. Decide where the bed, TV, desk, kitchen appliances and lights go before the walls are chased. While the walls are still open, the air conditioner’s pipes and runs are prepared too.
The walls are plastered first and left to dry well, and the floor screed is poured only after plastering, so that falling mortar does not damage a finished screed. After the partitions, putty, tiling, painting, flooring and plumbing fixtures follow in turn. The full order, from partitions to the final clean, is on renovation stages.
How are partitions handled in a black frame renovation?
In a black frame (a bare shell with no finishes), the interior partitions are often missing fully or partly, so the layout has to be set as soon as the work starts.
The exact layout of the living room, bedrooms and other zones should be fixed at the start, because the partitions are built at the very beginning of the renovation. A black frame has no wiring, plumbing or heating, so the work covers every main step.
A black frame renovation budget per m² assumes the partitions are already built. When they still need building, add the partition cost to the total. As a rough guide, the total area of partitions in a flat is close to its floor area. More detail is on black frame.
Does building or removing a partition in a flat need a permit?
Building, moving, adding or removing an interior partition in a flat, or cutting a door opening in it, counts as repair and needs neither a building permit nor a notice.
Under Government Resolution No. 255, non-load-bearing partitions may be changed without a permit, except fire-resistant separating walls. Work on a load-bearing wall is reconstruction and needs a permit, because load-bearing structures carry the floor above. The rules for load-bearing walls are set out on wall removal permit.
In Khrushchyovka, Moscow and Czech project buildings, a load-bearing wall is thicker than a partition, about 30-40 cm. So a structural engineer’s check is needed to tell what kind of wall it is. Moving and removing walls is covered in full on apartment replanning. Removing a non-load-bearing brick or block partition costs 10-35 GEL per m² of wall for labour, and removing a plasterboard partition about 5-10 GEL.
How do you check newly built partitions?
New partitions are checked right after they go up, before the wiring and plastering start on them.
For the check, use the flat plan, a tape measure and a long straight edge or a spirit level to see that the walls are straight.
The full details of accepting partitions and the other work are on our stage acceptance checklist.
How do you get a free preliminary estimate for partitions?
To get a free preliminary written estimate for partitions, send us the flat plan or a sketch of the new walls, the floor area and the building type.
Managing from abroad? Write in English for a free written preliminary estimate in 2 working days by email, WhatsApp, or Viber. How we run a job for owners abroad is on renovation for owners abroad.
Other stages and prices
Request an estimate
Based on your floor area, building type, and photos, you get a free reply by email, WhatsApp, or Viber within 2 working days, with no obligation. Before the contract we see the flat, in person or on a video call, and fix the price.
Our schedule is booked until January 2027, so new renovations start from January. You still get your estimate now, and we agree the date to see the flat now.