Apartment Replanning in Tbilisi: Moving Partitions and Removing Walls

We replan apartments in Tbilisi. We move, remove and build partitions, and we cut doorways and openings that join rooms.

Removing a non-load-bearing brick or block partition costs 10-35 GEL per m² of wall for labour, and removing a plasterboard partition about 5-10 GEL.

Removing or moving a non-load-bearing partition counts as repair and needs neither a building permit nor a notice. Combining the kitchen and living room needs no permit either, when only a partition separates them.

Removing a load-bearing wall or cutting an opening in it is reconstruction. That work needs a structural engineer’s check first, and in an apartment building it usually needs a permit too.

What does replanning and wall removal cost?

The cost of replanning adds up from removing partitions, building new walls and hauling away the debris.

The prices in the table are labour only, except where the row names materials.

Removing a reinforced-concrete wall is work on a load-bearing structure, so it needs an engineer and a permit first. Cutting a doorway or opening in a partition has no set price: it goes into the estimate after we see the wall.

WorkPrice
Removing a non-load-bearing brick or block partition 10 to 35 GEL per 1 m² of wall, debris removal not included
Removing a plasterboard (drywall) partition about 5 to 10 GEL per 1 m²
Removing a reinforced-concrete wall about 150 GEL per 1 m²
Building a block partition, labour about 25 GEL per 1 m² of partition
Block partition (blocks, adhesive and labour together) 40 to 45 GEL per 1 m² of partition
Plasterboard partition, one layer, labour 20 to 40 GEL per 1 m²
Hauling away construction debris about 150 to 300 GEL per trip

When does removing or moving a wall need a permit?

Removing or moving a non-load-bearing partition needs no permit, while work on a load-bearing wall is reconstruction and usually needs a permit in an apartment building.

Find your planned job and the rule for it in the table below.

WorkLegal statusWhat you need
Moving, removing or adding an internal partition (brick, block or plasterboard (drywall)) Repair Neither a permit nor a notice
Cutting a doorway in a partition Repair Neither a permit nor a notice
Combining the kitchen and living room when only a partition separates them Repair Neither a permit nor a notice
Removing a load-bearing wall or cutting an opening in it Reconstruction of a load-bearing structure Usually a permit in an apartment building
Altering the building’s utility networks (for example moving a shared riser) Network reconstruction Depends on building class, decided by the Architecture Service

This is general information, not legal advice.

Repair fixes defects without changing the building’s appearance or load-bearing structures, so it needs no permit. Reconstruction includes changing load-bearing structures or cutting openings in them.

In Tbilisi, unauthorised reconstruction that does not change the building’s outer dimensions carries a 4,000 GEL fine. The procedures are on wall removal permit.

How can you tell if a wall is load-bearing?

Only a structural engineer or the building’s design drawings can confirm whether a wall is load-bearing.

Looking at a wall or knocking on it tells you nothing. Load-bearing walls carry the floor above, and removing even one can bring down the building or part of it.

In many brick and block series, the load sits on three lengthwise walls, while in panel series it sits on lengthwise or crosswise walls. Only an architect and a structural engineer may prepare the design documents.

In Khrushchyovka, Moscow and Czech project buildings, a load-bearing wall is thicker than a partition, about 30-40 cm. How walls are laid out in Soviet panel and block buildings is on Czech project apartment renovation.

Block or plasterboard: which is better for a new partition?

Choosing a new partition comes down to the solidity of a block wall against the fitting price of plasterboard.

A block partition costs about 25 GEL per 1 m² of partition for labour. Blocks, adhesive and labour together cost 40-45 GEL per 1 m² of partition.

A one-layer plasterboard (drywall) partition costs 20-40 GEL per 1 m² for labour. Removing an old plasterboard partition costs about 5-10 GEL per 1 m².

How does replanning run, step by step?

Replanning follows a clear order, from the plan to the new partitions.

  1. Plan and furniture layout. The new room layout, door positions and furniture layout are fixed first.
  2. Check any wall in doubt. A structural engineer checks any wall in doubt and the building’s archive design drawings.
  3. Permit. If the work touches a load-bearing structure, the permit procedure goes through the Tbilisi City Hall Architecture Service.
  4. Demolition and debris removal. The old partitions come down and the debris goes out, at about 150-300 GEL per trip.
  5. New partitions. New partitions are built in block, or plasterboard structures are fitted.
  6. Next works. After the partitions come wiring, plastering and painting, as set out on renovation stages.

How do you get a preliminary estimate for replanning?

You get a free preliminary written estimate for replanning by sending your floor plan, wall photos and building type.

Send the floor plan or a sketch marking the walls to move, a photo of each wall and your building type. We reply by email, WhatsApp or Viber.

Managing from abroad? Write in English for a free written preliminary estimate in 2 working days by email, WhatsApp, or Viber. How we run a job for owners abroad is on renovation for owners abroad.

Request an estimate

Based on your floor area, building type, and photos, you get a free reply by email, WhatsApp, or Viber within 2 working days, with no obligation. Before the contract we see the flat, in person or on a video call, and fix the price.

Our schedule is booked until January 2027, so new renovations start from January. You still get your estimate now, and we agree the date to see the flat now.