Apartment Handover from a Developer: What to Check Before Signing
At apartment handover, compare the flat against your contract, floor plan, and specification annex before you sign. Record every defect in the handover report as a separate item with its exact location and a photo.
Check the floor area and room dimensions, partitions, walls and ceiling, and floor screed. Also check the windows and front door, electrical and water points, heating, and utility meters.
Which checks you need depends on your developer’s handover stage, as our black frame (bare shell), white frame, or green frame guide explains. Black, white, and green frames are checked on different details, and what each state includes is explained on that page.
What Should You Check at Apartment Handover?
At apartment handover, check the main apartment details before signing:
| Item to check | What to check |
|---|---|
| Floor area | Measure every room and compare the floor area with the floor plan and contract. |
| Partitions | Check that internal walls stand where the floor plan shows them. |
| Walls and ceiling | Look for flat surfaces with no cracks or damp patches. |
| Floor | Make sure the floor screed is level and does not crumble underfoot. |
| Windows and door | Open and close each window and door, and test the seals, glass, and locks. |
| Utility points | Check that switches, sockets, taps, and drains work where they should be. |
| Heating and meters | Confirm that installed heating works, and write down all meter readings. |
Room-by-Room Apartment Handover Checklist
Walk through the flat room by room in daylight with your contract and floor plan in hand. Tick off each item on the handover checklist and photograph any defect you find.
Floor Area and Layout
Walls and Ceiling
Floor and Screed
An uneven floor can mean redoing the floor screed later. Our floor screed guide explains what floor screed work involves.
Windows, Balcony, and Front Door
Electrics
Water and Drainage
Heating, Ventilation, and Meters
How Does the Inspection Differ for a Black, White, or Green Frame?
Your handover inspection depends on which works the developer delivers in each frame condition, so you check what is actually built.
Compare the flat with your contract’s specification annex before handover, because developers do not define the same frame condition identically.
| Check | Black frame | White frame | Green frame |
|---|---|---|---|
| Floor area, ceiling height, windows, front door | Yes | Yes | Yes |
| Partitions | Where built (some black frames have none) | Compare with floor plan | Yes |
| Wall plastering and ceiling | Usually unplastered | Yes | Yes |
| Floor screed | Usually no screed | Compare with annex | Yes |
| Electrical points | Brought to the flat entrance | Where listed in the annex, check each one | Yes, check every point |
| Water and drainage points | Check the annex for drainage | Where listed in the annex, check each one | Yes, check every point |
| Heating pipes and radiators | No | Check the annex | Usually pipes; check where installed |
| Meter readings | Yes | Yes | Yes |
How Do You Record Defects in the Handover Report?
Record each defect in the handover report as a separate item with an exact description, location, and photo. Agree in writing with the developer on the deadline and terms for fixing each defect.
A specific note like “crack in bedroom corner, photo 3” is far more useful than “several cracks”.
Fill in the report during the inspection, and write down anything you did not check. Do not sign a pre-printed “everything is in order” statement.
What to include in the handover report
Major and Minor Defects
Major defects (structural cracks, leaks, or non-working systems) must be fixed and re-checked before you sign the report. Log each minor defect as a separate item with a photo and agreed deadline.
Keep your contract, floor plan, specification annex, report, photos, and videos together.
Ask the developer for the electrical wiring and plumbing layout diagrams, as they will help you plan your apartment renovation.
What Should You Bring to Apartment Handover?
Bring the following items with you to your apartment handover inspection:
- Contract, floor plan, and specification: to compare the floor area and layout
- Tape measure
- Long straightedge or spirit level: for the walls and floors
- Light bulb or small electrical appliance, such as a hairdryer: to test sockets
- Torch (flashlight)
- Sheet of paper: to check for draughts at windows and test ventilation
- Phone with a camera, notepad, and pen
What Does It Cost to Fix Defects After Handover?
Fixing handover defects, for labour only, costs about 10-20 GEL per 1 m² to pour new floor screed and 15-25 GEL per 1 m² of wall to replaster. Materials are not included.
Labour prices (work only, no materials) for utility points and radiators are:
- 15-40 GEL per 1 electrical point
- 80-110 GEL per 1 plumbing point
- about 100 GEL to install 1 radiator
| Defect | Labour price | What the price includes |
|---|---|---|
| Uneven or cracked floor screed | 10 to 20 GEL per 1 m² | Pouring new floor screed |
| Uneven or cracked wall plaster | 15 to 25 GEL per 1 m² of wall | Replastering |
| Missing or misplaced electrical point | 15 to 40 GEL per 1 point | One new point |
| Missing or misplaced plumbing point | 80 to 110 GEL per 1 point | One new point |
| Uninstalled radiator | about 100 GEL per 1 radiator | Installing one radiator |
Floor screed removal costs an extra 10-35 GEL per 1 m² when old floor screed is crumbling. The old layer needs demolition (strip-out) before pouring a new layer.
Renovation After Apartment Handover
After handover we can renovate your flat from the condition you just inspected, with the start date and deadline written in our contract.
What a white frame renovation costs and the order of works are explained on our white frame renovation page.
Managing from abroad after handover? You can write in English for a free written preliminary estimate with no obligation.
It arrives within 2 working days by email, WhatsApp, or Viber. How we run a job for owners abroad is on renovation for owners abroad.
Frequently Asked Questions
Can you inspect the apartment at handover without a specialist?
Yes, you can do the apartment handover inspection yourself with the checklist on the page.
Bringing a specialist (an engineer or someone with construction experience) helps most where defects are hidden:
- Wiring
- Pipes
- Heating
- Waterproofing
When is the best time to inspect an apartment?
Daylight is the best time to inspect an apartment, so schedule your appointment for the morning or midday. Walls, floors, and the ceiling are easiest to check in natural light.
Does every crack in the floor screed require redoing it?
Not necessarily:
- A thin hairline crack on the surface alone may be cosmetic.
- A crack running through the full slab with widened edges can mean opening and redoing that section.
Either way, record every crack in the handover report with its location and a photo.
Request an estimate
Based on your floor area, building type, and photos, you get a free reply by email, WhatsApp, or Viber within 2 working days, with no obligation. Before the contract we see the flat, in person or on a video call, and fix the price.
Our schedule is booked until January 2027, so new renovations start from January. You still get your estimate now, and we agree the date to see the flat now.