Renovation Materials in Tbilisi: List and Prices
A flat renovation needs two kinds of materials. Rough materials (screed mix, plaster, adhesive) build the base. Finish materials (laminate, tiles, sanitary ware, doors) are what you see.
The prices below are for the material only, from Tbilisi shops in 2026.
We buy the rough materials and show you every receipt. You choose the finish materials.
What rough materials does a renovation need, and what do they cost?
Rough materials for a Tbilisi flat renovation cost from about 1.5 GEL for a plaster beacon to 50-160 GEL for a 10 L bucket of paint.
| Material | Pack or unit | Price |
|---|---|---|
| Sand-cement mix | 25 kg bag | 8.5 to 9 GEL |
| Screed material (bagged sand-cement mix) | per 1 m² per 1 cm of thickness | about 7 GEL (3 cm about 20, 5 cm about 35, 8 cm about 60 GEL per 1 m²) |
| Self-levelling compound | 25 kg bag | 35 to 60 GEL |
| Gypsum plaster (Rotband) | 30 kg bag | 20 to 30 GEL |
| Gypsum plaster for hand plastering | per 1 m² of wall per 1 cm of layer | 6.5 to 8.5 GEL |
| Gaji | 40 kg bag | about 5 GEL |
| Gaji or plaster mix | 25 kg bag | 7 to 9 GEL |
| Metal plaster beacon | 3 m piece | 1.5 to 2.5 GEL |
| Cement-based tile adhesive | 25 kg bag | 10 to 25 GEL |
| Gypsum putty, starter or finish | 25 kg bag | 10 to 30 GEL |
| Putty material, per 1 mm of layer | per 1 m² | about 0.5 to 1.5 GEL |
| Deep-penetrating primer | 10 L | 40 to 80 GEL |
| Interior water-based paint, white | 9-10 L | 50 to 160 GEL |
| Liquid elastic waterproofing | 5 kg bucket | 70 to 90 GEL |
| Waterproofing material, two coats | per 1 m² | about 15 to 25 GEL |
| Waterproofing sealing tape | 10 m roll | 50 to 70 GEL |
| Copper cable 3×2.5 mm² (sockets) | per metre | 4 to 5.5 GEL |
| Copper cable 3×1.5 mm² (lighting) | per metre | 2.5 to 3.5 GEL |
| PPR water pipe 20 mm | per metre | about 1.5 to 4 GEL |
What finish materials does a renovation need, and what do they cost?
Finish materials for a Tbilisi flat range from about 20-60 GEL per m² for laminate to about 1,500-4,000 GEL for a bathroom sanitary set.
The stretch ceiling row includes installation with a standard white film; gloss or coloured film costs more. Every other row is the material only.
How much material should you buy?
How much material you need depends on the area, how uneven the surfaces are, and the margin you keep.
Buy tiles and laminate with 5-15% extra: less for straight laying, more for diagonal laying.
Buy all your tiles from one batch, because different batches can vary in shade.
Gypsum plaster such as Rotband, applied by hand, uses about 8.5 kg per 1 m² for every 1 cm of thickness. That is about 6.5-8.5 GEL of material per 1 m² of wall per 1 cm, so a 2 cm layer needs twice as much. See wall plastering.
Floor screed needs about 20 kg of dry sand-cement mix per 1 m² for every 1 cm (about 0.8 of a 25 kg bag), which is about 7 GEL per 1 m². So 3 cm of screed material is about 20 GEL, 5 cm about 35 GEL and 8 cm about 60 GEL per 1 m². See floor screed.
Cement-based tile adhesive (10-25 GEL a bag) uses 2-4 kg per 1 m² on a flat surface, so one 25 kg bag covers about 6-12 m².
Who buys the materials, and how does the warranty apply?
We buy the rough materials and show you every receipt, and you choose the finish materials.
You pay a 20% advance at signing, which buys the first materials and books the crew for your start date. You can also buy finish materials yourself from our list.
Our warranty covers work such as tiling, screed, plastering, painting, the pipes and wiring we laid, and the doors and fittings we fitted. If you bought a finish material yourself, we still take responsibility for fitting it.
A factory fault in a material you bought is a matter for the seller. In a warranty case, we pay in full for the labour, materials and transport of the repair.
Appliances and factory products carry the maker’s warranty, and we hand over their papers at handover. Our warranty starts on the day you accept the whole job and sign the acceptance act.
How do materials sit inside the price per m²?
Our full price per m² includes works and materials together, from about 150 GEL (cosmetic) to 2,000 GEL and more (premium).
Single-stage rates on our stage pages are labour only where the page says so. We never mix labour-only prices with prices that include materials. See the full apartment renovation price and how a renovation estimate lists each line.
How do you check the materials in an estimate?
The contract carries our itemised estimate as an annex, with every job and material on its own line.
How do you get a free preliminary written estimate with materials?
You get a free preliminary written estimate by sending your flat’s area, building type and photos.
Tell us the finish level you want. Note that the preliminary estimate is a range, not an itemised list.
Managing from abroad? Write in English for a free written preliminary estimate in 2 working days by email, WhatsApp, or Viber. How we run a job for owners abroad is on renovation for owners abroad.
Request an estimate
Based on your floor area, building type, and photos, you get a free reply by email, WhatsApp, or Viber within 2 working days, with no obligation. Before the contract we see the flat, in person or on a video call, and fix the price.