Wall Painting (Maliarka): Price per m² in Tbilisi
Painting a prepared wall in 2-3 coats costs 5-25 GEL per 1 m² of wall. Full painting and decorating with skim coat and primer costs about 20-80 GEL per 1 m² of wall.
Your wall condition sets most of that gap. Uneven walls need more filler layers.
These sums are labour only, no materials. You pay for paint, filler and primer separately.
Check your likely labour cost by wall area and work type.
Work typeWall painting starts after plastering, filler drying and tile laying. You do it at the flooring and doors stage.
See the full order on the stages list.
What does maliarka cost per m²?
Maliarka labour prices per m² sit below, materials excluded.
The table shows labour only. You buy paint, filler and primer separately.
| Work | Labour price |
|---|---|
| Wall painting (2-3 coats) | 5 to 25 GEL per 1 m² of wall |
| Wall skim coat | 5 to 30 GEL per 1 m² of wall |
| Full maliarka (skim coat, primer and painting) | about 20 to 80 GEL per 1 m² of wall |
| Ceiling painting | about 10 to 25 GEL per 1 m² of ceiling |
| Ceiling skim coat and painting | about 15 to 40 GEL per 1 m² of ceiling |
| Corner bead installation | up to 25 GEL per linear metre |
What is included in maliarka?
Full maliarka includes several steps in order.
- Old wallpaper or peeling paint comes fully off the surface.
- Cracks get cleaned and filled.
- Primer coats the surface for better grip.
- Starter filler at 3-10 mm evens big uneven spots.
- Finish filler goes on in 1 or 2 thin coats.
- Dry filler gets sanded and sealed with final primer.
- Walls get at least 2 coats of paint, dark or bright colours need 3 coats.
Primer goes on before each stage and after sanding. Without it filler can peel and paint can spot.
Apply each filler coat only after the last one dries. Makers ask for 4 to 24 hours by product.
Apply the second paint coat only after the first dries fully.
What makes wall painting cost more?
Your final maliarka cost reflects several main factors.
- Wall start condition and filler coat count, uneven walls need more work.
- Window or lamp side light, flaws show on such walls and top class prep costs about 30-40% more than standard.
- Dark or bright colours and cheap paint, they often need 3 coats, which raises labour cost.
- Corner bead on outer corners, often priced apart at up to 25 GEL per linear metre.
- Ceiling work, ceiling painting and skim coat use a separate rate.
How much paint does 1 m² of wall need?
Paint use per coat is about 0.12-0.2 litres per 1 m² of wall. Tin labels assume a perfectly flat wall. Thirsty or uneven walls use more.
Your total wall area runs far above floor area. It is about 2.5-3 times larger.
So a wall m² price is not a floor m² price.
How is filler different from plastering?
Filler and plastering differ by coat thickness and job.
Wall plastering levels the surface with a thick coat. Skim coat (filler) is the thin finish coat that readies the wall for paint.
Wall painting is the stage that cosmetic renovation (refresh) covers with floors and interior doors.
How long does maliarka take?
One room prep and skim coat takes about 3-6 days for 20 m² of wall, drying included. Painting itself takes 1-2 days.
Work runs best from about +5 to +25 °C. Cold unheated flats dry poorly in winter.
How to check a painter before you agree a price?
You can judge a painter offer only from a written item list with units.
How to check a finished painted wall?
You check a finished wall by a few main points at handover.
Print this stage's sheet from our stage acceptance checklist.
How to get a free preliminary written estimate for maliarka?
You get a free preliminary written estimate by sending wall facts and photos.
Send wall area or room sizes and photos of each wall. State the surface now (new plaster, old paint or wallpaper), your paint or colour, and building type.
We build your free preliminary written estimate from this data. You get it by email, WhatsApp or Viber.
Managing from abroad? Write in English for a free written preliminary estimate in 2 working days by email, WhatsApp, or Viber. How we run a job for owners abroad is on renovation for owners abroad.
Other stages and prices
Other stages and prices that fit wall painting are here.
Request an estimate
Based on your floor area, building type, and photos, you get a free reply by email, WhatsApp, or Viber within 2 working days, with no obligation. Before the contract we see the flat, in person or on a video call, and fix the price.
Our schedule is booked until January 2027, so new renovations start from January. You still get your estimate now, and we agree the date to see the flat now.